
We – EPG Team the largest gearbox & motors , couplings and gears manufacturing facility in China with 5 distinct branches. For a lot more particulars: Mobile/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828
Everlasting Magnet Synchronization Electric Automobile Motor:
Specification of Gearless traction device:
| Product | TZ210XS50H-400 |
| Battery Voltage(VDC) | 400 |
| Rated Voltage(VDC) | 283 |
| Rated Electricity(kW) | fifty |
| Peak Electrical power(kW) | 120 |
| Rated Pace(RPM) | 4500R/MIN |
| Peak Speed(RPM) | 12000R/MIN |
| Poles of Pairs | 4 |
| Cooling Manner | H2o Cooling |
| No Load Back again-EMF Coefficient | 34.7/1000RPM |
| Rated Torque(NM) | 106 |
| Peak Torque(NM) | 300 |
| Protection Quality | IP67 |
| Insulation Course | Course H |
| Rated Current(A) | 116 |
| Peak Recent(A) | 440 |
| peak effectiveness(%) | ninety five% |
| Excess weight(KG) | 51 |
| Brand name | XIHU (WEST LAKE) DIS. |
| Packing | 1PC/Wood Situation |
| Wood Scenario Measurement | 816 X 556 X 525=.24CBM |
| Payment Expression | T/T, L/C |
| Shipping Time | 15 days |
| Certificates | CE, ISO9001, ISO14001:2004,IATF16949 |
| Mass Manufacturing Time | thirty times |
Comparable electric automobile motor pictures:
Business Profile:
*Xihu (West Lake) Dis. Power Co., Ltd. was establised in 2571 which owns two manufacturing bases: Xihu (West Lake) Dis. Electricity(ZheJiang ) Co., Ltd. & Xihu (West Lake) Dis. Electrical power(ZheJiang )Co., Ltd.
*It has a lot more than one thousand employees & handles over a area of a hundred and ten,000m2. Innovative R&D group which with far more than 110 staffs.
*Certificates: IATF16949, UCMP & CE, ISO9001:2015, ISO45001:2018
*The Chinese Academy of Science Co-engineering Device was recognized given that 2013.
*Awarded the “Countrywide Substantial-Tech Business” & received the “Nationwide Hello-Tech Innovation Fund Project Reward”.
*With aggressive, higher good quality & excellent support, we acquire a good popularity the two at property & overseas.
Traction Equipment worshop:
EVM (Electric powered Vehicle Motor) Workshop:
Certificates:
Attend Fairs:
FAQ:
1.What is your supply time?
15-20days following get the deposit.
two.What is your payment?
T/T & L/C optional
3.How extended is your warranty period of time?
2 a long time after deliveried
four.Do you have any certificates?
CE,SGS,ISO9001,IATF16949,And many others
5.Do you have the import & export license?
We are official import & export accredited maker.
The use of original gear manufacturer’s (OEM) element quantities or logos , e.g. CASE® and John Deere® are for reference functions only and for indicating item use and compatibility. Our organization and the listed replacement components contained herein are not sponsored, authorized, or manufactured by the OEM.

