{"id":1878,"date":"2021-01-18T04:26:13","date_gmt":"2021-01-18T04:26:13","guid":{"rendered":"http:\/\/flangecoupling.top\/?p=1878"},"modified":"2022-11-07T02:40:47","modified_gmt":"2022-11-07T02:40:47","slug":"energy-units-for-double-scissors-lift","status":"publish","type":"post","link":"https:\/\/flangecoupling.top\/nl\/application\/energy-units-for-double-scissors-lift\/","title":{"rendered":"Energy UNITS FOR DOUBLE-SCISSORS LIFT"},"content":{"rendered":"<p>General Description<br \/>Outfitted together with the zero leak bidirectional checking sole-noid valves,  this  energy  unit  is  made for that operation of  two independent circuits.  Which  are  respectively for your key and subordinate platforms in the double scissors lift. Two  cut-off  valves are made use of for lowering the machine manually in case of power loss. If more independent circuits are necessary for the application please get hold of us for availability.<br \/>Remark:  1. <img decoding=\"async\" src=\"https:\/\/img.hzpt.com\/1207\/POWER%20UNITS%20FOR%20DOUBLE-SCISSORS%20LIFT.jpg\" align=\"right\" width=\"256\" style=\"padding:10px;\" alt=\"\" title=\"\">Please check with our income engineer to the distinctive pump displacement, motor power or tank capacity.<br \/>two. CSA or UL licensed motors can be found upon request.<br \/>Special Notes<br \/>one.\tThe AC motor is of S3 duty cycle, which could only operate intermittently and repeatedly, i.e., 1minute on and 9 minutes off.<br \/>two.\tClean all the hydraulic components concerned in advance of set up of  the energy unit.<br \/>3.\tViscosity in the oil shoud be 15~46 cst,along with the oil ought to be clean and free of impurities,N46 hydraulic oil is suggested.<br \/>four.\tThe energy unit should be mounted vertically.<br \/>5.\tCheck the oil level while in the tank right after the original operating of your electrical power unit.<br \/>six.\tOil altering is needed soon after the preliminary a hundred operation hrs,afterwards when each and every 3000 hours.<\/p>","protected":false},"excerpt":{"rendered":"<p>General DescriptionOutfitted together with the zero leak bidirectional checking sole-noid valves, this energy unit is made for that operation of two independent circuits. Which are respectively for your key and subordinate platforms in the double scissors lift. Two cut-off valves are made use of for lowering the machine manually in case of power loss. If [&hellip;]<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-1878","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/flangecoupling.top\/nl\/wp-json\/wp\/v2\/posts\/1878","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/flangecoupling.top\/nl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/flangecoupling.top\/nl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/flangecoupling.top\/nl\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/flangecoupling.top\/nl\/wp-json\/wp\/v2\/comments?post=1878"}],"version-history":[{"count":1,"href":"https:\/\/flangecoupling.top\/nl\/wp-json\/wp\/v2\/posts\/1878\/revisions"}],"predecessor-version":[{"id":1879,"href":"https:\/\/flangecoupling.top\/nl\/wp-json\/wp\/v2\/posts\/1878\/revisions\/1879"}],"wp:attachment":[{"href":"https:\/\/flangecoupling.top\/nl\/wp-json\/wp\/v2\/media?parent=1878"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/flangecoupling.top\/nl\/wp-json\/wp\/v2\/categories?post=1878"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/flangecoupling.top\/nl\/wp-json\/wp\/v2\/tags?post=1878"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}